Estimated Construction Cost
ESTIMATE FOR THE BUILDING OF THE RAILROAD
The commissioners to make estimates were Powell Carpenter, Philip Garbutt, William Garbutt, John McNaughion, and E. H. S. Mumford.
Ties 8,366 pieces...................................... $ 1,300.00 Rails 133,848 feet..................................... 1,400.00 Laying Timber-6.34 miles............................... 1,300.00 Bridge at Mumford...................................... 850.00 Grading from Hanford's to Scottsville.................. 1,044.00 Two bridges across canal............................... 100.00 Grading from Hanford's to H. C. McVean's............... 200.00 Grading and passways................................... 200.00 Grading Reed's ridge................................... 240.00 Timber and Planking bridge at P. Garbutt's store....... 40.00 McKenzie and Laidlaw's job at grading.................. 1,600.00 Grading at McNaughton's ............................... 800.00 Grading at McArthur's.................................. 400.00 Grading at Blakeslee & Wells........................... 1,450.00 Grading John A. McVean's hill.......................... 654.00 Grading from sawmill to plaster mill in Mumford........ 500.00 Mason work and culverts west of Reed's................. 300.00 Balance of engineering................................. 500.00 Amount paid by Philip Garbutt.......................... 4,132.00 $19,870.00 Monies advanced on contracts included in this estimate ...1,363.00 One and one-quarter timber laid........................... 453.00 Digging plaster........................................... 230.00 S 2,046.00 $17,814.00 Making 6.3 miles of road at $2,815.00 per mile..........$17,818.33Read more about this topic: Scottsville And Le Roy Railroad
Famous quotes containing the words estimated, construction and/or cost:
“... many of the so-called grievances of women are false. No man ever unfairly discriminated against me. If one tried to, I ... was equal to the emergency, and such experience really added a great deal to the zest of life.... women, as a habit, over- estimated their ability, and ... they were too untrained even to appreciate the magnitude of their undertaking.”
—Alice Foote MacDougall (18671945)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)
“To call a posit a posit is not to patronize it. A posit can be unavoidable except at the cost of other no less artificial expedients. Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built.”
—Willard Van Orman Quine (b. 1908)