The Asker Line runs from Lysaker Station via Sandvika Station to Asker Station, in the municipalities of Bærum and Asker. The line is built to increase the traffic on the west corridor. The only railway west of Oslo has been the Drammen Line, which has limited capacity, and a mix of local, regional, intercity and freight trains. This has caused many delays and poor utilization of tracks, as some trains make many stops and others only a few. The Asker Line allows regional and intercity trains to by-pass the local stations east of Asker, by running local trains and freight trains on the Drammen Line, while faster trains run on the new track. The Asker Line was built in two stages: the first from Asker to Sandvika was built from 2001 to 2005, and the second stage, from Sandvika to Lysaker, between 2007 and 2011. The other two tunnels on the Asker Line are the 3,790-meter (12,430 ft) long Skaugum Tunnel and the 3,590-meter (11,780 ft) long Tanum Tunnel.

There were four main contracts for building the line issued after public tenders. Three of these involved part of the tunnel, and were awarded to Skanska, Veidekke and NCC. Mesta, Mika, Bestonmast and Spesialprosjekt bid, but failed to win any contracts. Work was done from 06:00 through 02:00, and noisy work was avoided before 07:00 or after 22:00. Any work outside the tunnels was only done between 07:00 to 18:00, and from 08:00 to 16:00 on Saturdays. The tunnel is built using the drilling and blasting method, which involved blasting sections of 5 meters (16 ft) of rock at a time, with a progress of 15 meters (49 ft) per week per team. Blasting started on 26 June 2007. Construction is done from three crosscuts, a 60-meter (200 ft) long section at Engervannet, a 250-meter (820 ft) long section at Fossveien, and a 420 meters (1,380 ft) long section at Skallum. At Skallum, a rinsing system for the water using in the tunneling was established, allowing the water to be recycled.

The tunneling resulted in 800,000 cubic meters (28,000,000 cu ft) of earthwork, most of which was used for the expansion of the Port of Drammen. It was transported away from the tunnel with up to 12 truckloads per hour. The first breakthrough took place on 5 June 2008. On 19 October 2008, there was a ground failure at a storage area of earthwork. This caused a land slip which pressed up earthwork nearby at Gjønnes Station on the Kolsås Line of the Oslo Metro; a 50 meters (160 ft) long section of one platform and track was pressed up 3 meters (9.8 ft), resulting in the other track laying on its side. Because of changes to European Union regulations after planning of the project, three extra emergency staircases had to be installed in late 2009. The final breakthrough in the tunnel occurred on 26 July 2009. The tunneling took place under the groundwater level. To avoid similar problems which occurred during the construction of the Romerike Tunnel, where massive leaks took a year to fix, several test bores were made in the area to measure the groundwater level. Any indications of a change would immediately be automatically communicated to the on-site geologists, who would be able to act accordingly. The system also automatically pumped water into the affected areas to compensate for any leaks until they could be fixed.

To make the tunnel water and frost tight, the walls were covered with polyethylene mats. Because they are highly inflammable, they were then covered in a layer of gunite. Also installed were fire water pipes and ventilation systems to remove smoke. To sound-insulate the tunnel and avoid vibrations spreading to nearby housing, the entire tunnel was covered in a layer of rock wool. By December 2010, the ballast had been laid, and in January 2011 laying of the tracks and ties started. The work to build the tracks and overhead wires has been contracted to Baneservice. The contract for the electro-technical installations was awarded to YIT Building Systems for NOK 120 million. As of 2006, the whole section from Lysaker to Sandvika was estimated to cost NOK 2.7 billion.

Freight trains started using the tunnel on 26 August 2011, and passenger trains on 28 August. The official opening took place on 2 September. Along with several other projects west of Oslo, including a new Lysaker Station and Høvik Station, and an upgrade to the Drammen Line between Lysaker and Etterstad, the completion of the Asker Line will allow higher service frequency, higher regularity and faster trains west of Oslo. A new high-frequency schedule, named Route Plan 2012, was planned for introduction in early 2013 following delivery of new Stadler FLIRT trains. This will also allow for more trains that stop at all stations on the Drammen Line and introduce three hourly trains to Vestfold and six hourly trains stopping at the main stations west of Oslo.

Read more about this topic:  Bærum Tunnel

Other articles related to "history":

Voltaire - Works - Historical
... History of Charles XII, King of Sweden (1731) The Age of Louis XIV (1751) The Age of Louis XV (1746–1752) Annals of the Empire – Charlemagne, A.D ... II (1754) Essay on the Manners of Nations (or 'Universal History') (1756) History of the Russian Empire Under Peter the Great (Vol ... II 1763) History of the Parliament of Paris (1769) ...
Xia Dynasty - Modern Skepticism
... The Skeptical School of early Chinese history, started by Gu Jiegang in the 1920s, was the first group of scholars within China to seriously question the traditional story of its early history ... early Chinese history is a tale told and retold for generations, during which new elements were added to the front end" ...
History of Computing
... The history of computing is longer than the history of computing hardware and modern computing technology and includes the history of methods intended for pen and paper or for chalk and slate, with or without the ...
Casino - History of Gambling Houses
... form or another has been seen in almost every society in history ... and Romans to Napoleon's France and Elizabethan England, much of history is filled with stories of entertainment based on games of chance ... In American history, early gambling establishments were known as saloons ...
Spain - History - Fall of Muslim Rule and Unification
... The breakup of Al-Andalus into the competing taifa kingdoms helped the long embattled Iberian Christian kingdoms gain the initiative ... The capture of the strategically central city of Toledo in 1085 marked a significant shift in the balance of power in favour of the Christian kingdoms ...

Famous quotes containing the word history:

    History takes time.... History makes memory.
    Gertrude Stein (1874–1946)

    The history of philosophy is to a great extent that of a certain clash of human temperaments.
    William James (1842–1910)

    Jesus Christ belonged to the true race of the prophets. He saw with an open eye the mystery of the soul. Drawn by its severe harmony, ravished with its beauty, he lived in it, and had his being there. Alone in all history he estimated the greatness of man.
    Ralph Waldo Emerson (1803–1882)