North Terminal
A future north terminal will be built north of the existing facility and could be operational by 2030 depending on demand, although the exact time frame is debatable (the economic downturn has delayed the need for the terminal at the present time). Infrastructure and design concepts are being developed in anticipation of the need for the second terminal facility. Phase 1 will be the first of several to open. It will consist of half the terminal building with one airside that will be used for all international flights. The two phase terminal building will be similar to the existing south terminal but plans are to combine the ticket and transfer levels. As with the exiting terminal facility, many concept designs have been reviewed. A roadway system will allow passengers access to the new facility from the existing airport parkway. Plans may also include a light rail station.
Read more about this topic: Tampa International Airport, TPA Airport Today
Famous quotes containing the words north and/or terminal:
“The battle of the North Atlantic is a grim business, and it isnt going to be won by charm and personality.”
—Edmund H. North, British screenwriter, and Lewis Gilbert. First Sea Lord (Laurence Naismith)
“All sin tends to be addictive, and the terminal point of addiction is what is called damnation.”
—W.H. (Wystan Hugh)