Evergreen 3
In August 2008 Chiltern Railways announced Project Evergreen 3 to create a new passenger service between Oxford and London Marylebone via High Wycombe by 2012. As part of this project Chiltern Railways would double most of the line, build a new Water Eaton Parkway passenger station to serve Kidlington and north Oxford and open the short 'missing-link' from Bicester Town station to the Chiltern Main Line. This would give Oxford an alternative to First Great Western's rail link to London Paddington and provide Oxford with a direct rail-link to High Wycombe for the first time since British Railways closed the Princes Risborough - Oxford section of the Wycombe Railway in 1964.
This work is one element of the East West Rail Link which would see a new 100 mph (160 km/h) service linking Oxford with Milton Keynes, Bedford and possibly also Cambridge.
Read more about this topic: Oxford To Bicester Line, Plans
Famous quotes containing the word evergreen:
“The evergreen woods had a decidedly sweet and bracing fragrance; the air was a sort of diet-drink, and we walked on buoyantly in Indian file, stretching our legs.”
—Henry David Thoreau (18171862)