The Triangle Link (Norwegian: Trekantsambandet) is a fixed link with three branches that connects the islands of Stord and Bømlo to each other and to the mainland at Sveio, Norway. It consists of the underwater Bømlafjord Tunnel from Sveio to the island of Føyno, the Stord Bridge from there to Stord, and a road including the Bømla Bridge and the Spissøy Bridge to Bømlo. The section from Sveio to Stord is part of European Route E39, while the branch to Bømlo is part of County Road 542.

The Bømlo Tunnel is 7,860 meters (25,790 ft) long and reaches 260 meters (850 ft) below mean sea level. It is the longest subsea tunnel in Norway and was the deepest in the world when it opened. The Stord Bridge and Bømla Bridge are both suspension bridges, with lengths of 1,077 and 998 metres (3,533 and 3,274 ft) and main spans of 677 and 577 meters (2,221 and 1,893 ft). The Spissøy Bridge is a 283-meter (928 ft) beam bridge. The link is 21.5-kilometer (13.4 mi) long toll road with a toll plaza on Føyno. The section from Stord to Bømlo has a pedestrian and bicycle path.

Plans for a link between Bømlo and Stord were first launched as a pontoon bridge in the 1960s. In the late 1980s, the plans evolved into a triangular project. There was controversy surrounding the project, in particular from environmentalists. The Parliament of Norway passed the plans in 1996, and construction started the following year. The bridges and link between Stord and Bømlo opened on 28 December 2000, while the tunnel opened on 30 April 2001. The link cost 1.8 billion Norwegian krone (NOK) after substantial cost overruns and will remain a toll road until late 2012 or 2013.

Read more about Triangle LinkRoute Description

Other articles related to "triangle link, triangle, link":

Spissøy Bridge - History - Construction
... Youth, and The People's Movement Against the Triangle Link had to be moved ... the same method and by the same contractors, Arbeidsfellesskapet Triangle Contractor, a joint venture between NCC Eeg-Henriksen and HBG Steel Structures ... of NOK 900 million in three projects, the Triangle Link, the Lærdal Tunnel and parts of National Road 555 ...
Spissøy Bridge - History - Opposition
... take longer time to plan—and thus complete—the Triangle Link ... January 1988 showed that 78.6 percent of the population of Bømlo wanted the Triangle Link, while 8.6 percent wanted the pontoon bridge ... loans with various banks to receive financial guarantees for the Triangle Link, and by February sufficient funding had been secured ...
Triangle Link - History - Opening and Operation
... The first part of the link, between Stord and Sveio, including the Stord Bridge and Bømlafjord Tunnel, was taken into use on 27 December 2000 ... Public Roads Administration in 2001 and the Triangle Link was the first to take the system into use ...