Design and Construction
The Maginot-era site was approved in 1934. Work by the contractor Caroni cost 8.26 million francs. A planned second phase was to add an artillery block and support facilities. The rise in tensions between France and Germany in the late 1930s prevented the second phase from being pursued.
Read more about this topic: Ouvrage Boussois
Other articles related to "design and construction, construction, designs, design":
... Hence the construction of the new building has been described in Buildings of Wales Glamorgan as a "remarkable gesture of faith the South Glamorgan County ...
... Learning Curve introduced some new designs for the track surface of wooden toy railways, such as the "Clicketyclack" rails patented in 1995 and the newer tracks with a relief to supply better traction grip for ... These improved designs were manufactured until 2002 when they were replaced with a third generation of design, which included new and more detailed faces ...
... "Process design" (in contrast to "design process" mentioned above) refers to the planning of routine steps of a process aside from the expected result ... Processes (in general) are treated as a product of design, not the method of design ... age, consultants and executives have found the term useful to describe the design of business processes as well as manufacturing processes ...
... The ship's navigation radar is the Norcontrol DB2000 operating at I band. ...
Famous quotes containing the words construction and/or design:
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“We find that Good and Evil happen alike to all Men on this Side of the Grave; and as the principle Design of Tragedy is to raise Commiseration and Terror in the Minds of the Audience, we shall defeat this great End, if we always make Virtue and Innocence happy and successful.”
—Joseph Addison (16721719)