Pre-determined Overhead Rate

A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins. The first step is to estimate the amount of the activity base that will be required to support operations in the upcoming period. The second step is to estimate the total manufacturing cost at that level of activity. The third step is to compute the predetermined overhead rate by dividing the estimated total manufacturing overhead costs by the estimated total amount of cost driver or activity base. Common activity bases used in the calculation include direct labor costs, direct labor hours, or machine hours.

This is related to an activity rate which is a similar calculation used in Activity-based costing. A pre-determined overhead rate is normally the term when using a single, plant-wide base to calculate and apply overhead. Overhead is then applied by multiplying the pre-determined overhead rate by the actual driver units. Any difference between applied overhead and the amount of overhead actually incurred is called over- or under-applied overhead.

Read more about Pre-determined Overhead RateThe Need For A Pre-determined Rate, How To Find The Overhead Rate, What Is The Right Basis To Use To Calculate The Overhead Rate, How To Calculate The Overhead Budget Using The Rate, Sources

Famous quotes containing the words rate and/or overhead:

    At the rate science proceeds, rockets and missiles will one day seem like buffalo—slow, endangered grazers in the black pasture of outer space.
    Bernard Cooper (b. 1936)

    There’s something wonderfully exciting about the quiet sing song of an aeroplane overhead with all the guns in creation lighting out at it, and searchlights feeling their way across the sky like antennae, and the earth shaking snort of the bombs and the whimper of shrapnel pieces when they come down to patter on the roof.
    John Dos Passos (1896–1970)