Line S2, Beijing Suburban Railway - Phase II

Phase II

It is not known if phase 2's track is going to be created or not.

Read more about this topic:  Line S2, Beijing Suburban Railway

Other articles related to "phase ii, phase, ii":

Star Trek (film Series) - Development - Origins
... with a new television series, Star Trek Phase II ... Star Wars could do well at the box office, so the studio canceled production of Phase II and resumed its attempts at making a Star Trek film ... the set elements created for the earlier aborted "Phase II" television series were adapted and enhanced for use in the first feature film ...
Ciudad Deportiva (Nuevo Laredo) - Phase II
... Phase II of this project will include a new soccer stadium within Mexican Primera Division standards for a possible expansion of one of its teams to Nuevo Laredo ... Part of Phase II has already been completed which includes an indoor stadium with a capacity of 4,000 fans that allows fans to enjoy basketball, volley ball, and ...
Silver Line (MBTA) - History - The Silver Line
... The first section opened, known as Silver Line Phase I, was the line along Washington Street currently referred to as SL5 it is the ultimate product of community demands for restoration of local service after the ... The tunneled section extending east of South Station, known as Silver Line Phase II, was constructed in conjunction with Boston's Big Dig and was originally ... Tunnel sections were fabricated in a nearby, World War II–era dry dock and floated into place ...
Line 15, Beijing Subway - Route Under Construction - Phase II
... As of April 2009, Phase II plans showed the western half of Line 15 running from Xiyuan in Haidian District, through the campus of Tsinghua University, Zhongguancun, and the Olympic Green, and joining Phase I ... But by October 28, 2009, those Phase II were undergoing major revision, with one proposal extending Line 15 westward as originally planned with additional ...
List Of Cal Poly Pomona Presidents - Student Life - Housing
... Aliso 212 Encinitas 212 Montecito 212 Cedritos 185 Palmitas 185 Suites Phase I 420 Suites Phase II 622 University Village Phase I 384 University ... Phase I of the construction of the Suites, housing 420 students, was completed in 2004 and Phase II, housing 622 students, opened in 2010 ...

Famous quotes containing the word phase:

    The problem of the twentieth century is the problem of the color-line—the relation of the darker to the lighter races of men in Asia and Africa, in America and the islands of the sea. It was a phase of this problem that caused the Civil War.
    —W.E.B. (William Edward Burghardt)